The quick answer
The GRN process is how a store or warehouse checks incoming goods and adds them to stock. The usual steps are: gate entry, document check against the purchase order, unloading and counting, quality check, posting the GRN, labelling, put-away to a rack, and matching the purchase order, GRN and supplier invoice before payment. Record only what you physically received and accepted — never just copy the invoice.
Most stock problems start at receiving. A GRN posted from the invoice instead of a real count puts wrong stock into the system on day one. Everything after that — issues, dispatch, the year-end count — inherits the error. If your stock already does not match, read stock mismatch in warehouse: causes and fixes.
What is a GRN (goods receipt note)?
A goods receipt note, also called a goods received note or material receipt note, is the internal record that says: these items, in this quantity and condition, arrived from this supplier on this date, against this order. The store team creates it. Purchase, quality and accounts all use it.
People often mix up four documents at the gate. Here is the difference:
| Document | Who makes it | What it says |
|---|---|---|
| Purchase order (PO) | Your purchase team | What you ordered, the price and the delivery date |
| Delivery challan / delivery note | Supplier | What the supplier says is in the truck |
| Supplier invoice | Supplier | What the supplier wants to be paid for |
| Goods receipt note (GRN) | Your store team | What you actually received and accepted |
Only the GRN is your own proof. That is why it must come from a real count at the dock, not from the supplier’s papers.
GRN process in warehouse: 8 steps
- Gate entry. Security records the vehicle number, driver, supplier, time in and the documents carried (invoice, delivery challan, e-way bill where needed). A truck that is not recorded at the gate should not reach the dock.
- Document check. The store keeper checks that an open purchase order exists for this supplier and these items. No PO, no unloading — or follow your written exception rule.
- Unload and count. Unload at a marked receiving area, not straight into the racks. Count cartons first, then open a sample to check the quantity inside. Take photos of the load and of any damage.
- Quality check. For items that need inspection, move them to a “QC hold” area. Record pass, fail or partial pass. Failed items stay apart from good stock.
- Post the GRN. Enter the accepted quantity against each PO line, with batch or lot number, expiry date where it applies, and any shortage, excess or damage noted. The GRN number is created now.
- Label. Put a barcode or QR label on each carton, pallet or bin, linked to the GRN and item code. This is what lets every later move be scanned.
- Put-away. Move goods to a defined rack or bin and record the location. Goods that sit in the receiving area for days are a common reason for “stock in system, not on rack”.
- Close and match. Accounts matches the PO, GRN and supplier invoice (three-way matching) before payment. Differences go back to purchase for a debit note, credit note or replacement.
GRN format: the fields you need
Whether you use paper, Excel or software, a good GRN format has these fields. Missing any one of them usually causes a dispute later.
| Field | Why it matters |
|---|---|
| GRN number and date | A unique reference for audit and payment |
| Supplier name and code | Links the receipt to the right vendor account |
| PO number and PO line | Proves the goods were ordered |
| Invoice / delivery challan number and date | Needed for three-way matching |
| Vehicle number and gate entry time | Connects the GRN to the truck that came in |
| Item code and description | Stops look-alike items being booked under the wrong code |
| Unit of measure | Avoids box vs piece vs kg mix-ups |
| Quantity: as per invoice, received, accepted, rejected | Shows any shortage, excess or rejection clearly |
| Batch / lot, expiry or manufacture date | Needed for FIFO / FEFO and recalls |
| QC status and remarks | Keeps failed goods out of usable stock |
| Storage location (rack / bin) | So the item can be found later |
| Received by, checked by, photos | Who is responsible, with proof |
What to do with short, excess, damaged or wrong goods
Discrepancies are normal. What matters is that they are recorded at the dock, with proof, on the same day.
| Situation | What to record on the GRN | Next step |
|---|---|---|
| Short supply | Received quantity, not invoice quantity | Tell purchase; supplier sends the balance or a credit note |
| Excess supply | Accept only up to the PO quantity (or your agreed tolerance) | Hold the extra apart; return it or raise a PO change |
| Damaged goods | Rejected quantity, photo and reason | Keep in a hold area; return with a proper document |
| Wrong item or wrong size | Reject the line; do not book it under the ordered code | Return to supplier; reorder if needed |
| QC failed | QC rejected quantity and test remarks | Return or rework as per your quality rule |
| No purchase order | Do not post a normal GRN | Hold at the gate or dock until purchase approves |
Golden rule: rejected or held goods must never sit on the same rack as good stock. Mixed returns are one of the most common causes of a stock mismatch.
PO, GRN and invoice: three-way matching
Three-way matching means accounts pays a supplier only when three documents agree: the purchase order (what you ordered and the price), the GRN (what you received) and the supplier invoice (what you are asked to pay). If the invoice says 42 and the GRN says 40, you pay for 40.
This only works if the GRN is honest. A GRN copied from the invoice makes the match useless, because the two documents will always agree. Many companies also set a small tolerance (for example on weight-based items) so tiny differences do not block every payment.
Paper GRN vs barcode GRN
| Step | Paper / Excel GRN | Barcode GRN in a WMS |
|---|---|---|
| Count | Counted by hand, written on paper | Each carton scanned against the PO line |
| Shortage / excess | Found later, often by accounts | Shown on screen at the dock |
| GRN entry | Typed into ERP hours or days later | Created at the dock, stock updated at once |
| Proof | Signature on paper, easy to lose | Person, time and photos saved |
| Put-away | Store keeper decides, location often not recorded | System suggests a rack; a scan confirms it |
| Audit trail | Hard to trace | Full history from gate to rack |
What to measure in receiving
- Dock-to-stock time — time from truck arrival to goods available in a rack. Long times mean goods wait in the receiving area, unrecorded.
- Pending GRNs — trucks unloaded but GRN not yet posted. This should be close to zero at the end of every shift.
- Receiving discrepancy rate — share of GRN lines with a shortage, excess, damage or wrong item, by supplier. It shows which suppliers need a talk.
- GRN corrections — GRNs edited or cancelled after posting. A high number means counting at the dock is weak.
Store keeper checklist for every GRN
- Gate entry done, vehicle number and time recorded
- Open PO found for this supplier and these items
- Goods unloaded to the receiving area, not to the racks
- Cartons counted and a sample opened
- Photos taken of the load and of any damage
- Unit of measure checked (box, piece, kg, metre)
- Batch, lot and expiry captured where needed
- QC items moved to QC hold
- GRN posted with received, accepted and rejected quantity
- Labels put on every carton or pallet
- Put-away done and rack / bin recorded the same day
- Rejected goods kept apart with a return document
Country notes
The GRN steps are the same everywhere. Tax and audit rules decide which papers you must keep with it.
- India: Under GST, a buyer can claim input tax credit only after the goods are actually received, so a dated GRN is useful proof. Goods moving by road above a set value usually travel with an e-way bill, and the delivery challan or invoice number should be on the GRN.
- Gulf (UAE, Saudi Arabia, Qatar, Oman): VAT-registered businesses must keep proper purchase and stock records. For free-zone or bonded stores, receipts should be clearly linked to the customs document and location.
- South-East Asia: Singapore, Malaysia, Thailand, Vietnam and Indonesia each have their own tax record rules. Multi-site companies should use one GRN format and one discrepancy rule at every site.
- USA, UK and Australia: Three-way matching of PO, receipt and invoice is a common accounts payable control, and auditors often test it. A clean GRN history makes those checks quick.
General information only, not legal, tax or audit advice. Rules change — always check with a local advisor.
How DinMind WIMS runs the GRN process
WIMS by DinMind is a barcode warehouse management system for factory stores and warehouses. Security does gate check-in on screen. The supplier invoice is read automatically, or pasted from Excel, and checked against the item master. At the dock, each carton is scanned against the purchase order, short or extra quantity shows at once, unloading photos are saved, and the GRN is created automatically. The handheld then guides put-away to the right rack. WIMS connects to your ERP, and most DinMind modules go live in 4–8 weeks.