The quick answer
The contract labour payroll process has 8 steps: fix one attendance format and cut-off date, collect attendance from every site, check it, get site approval, run salary with each client’s rates, clear exceptions, pay with payslips and a bank file, then file PF and ESI and send the client bill from the same numbers.
The process itself is not hard. What makes it slow is that the same numbers are typed three times: once in the site sheet, once in the salary sheet and once in the client bill. Remove that, and payroll for hundreds of workers can fit in one working day.
Want to check PF, ESI and the bill for one worker first? Use our free contract labour payroll calculator.
Why contract labour payroll takes a week
An in-house payroll team pays its own staff from one attendance system. A manpower contractor is different. Workers sit at many client sites, and each client has its own rules.
- Attendance arrives late and in different formats. One site sends a punch report, another a photo of a muster roll, a third an Excel with its own columns.
- Every client has its own rate card. Different wage, allowances, overtime rule, shift length and PF rule (capped or on full wage).
- Mistakes are found after salary. A worker shows 31 days in a 30-day month, or is marked at two sites on the same day. The fix happens after the bank transfer, through calls and arrears.
- The bill is made separately. The client bill is built in a new sheet, so salary days and bill days do not match, and the client holds the payment.
What to set up once (before your first one-day payroll)
The one-day payroll is won or lost before the month starts. Set these up once and keep them current.
| Set up | What it holds | Why it saves time |
|---|---|---|
| Worker master | Name, ID, client site, UAN, ESI number, bank account, joining date, grade | No missing bank or UAN on payroll day |
| Client rate card | Wage per grade, allowances, overtime rule, shift hours, PF rule, service charge | Salary and bill use the same rules every month |
| Attendance format | One agreed set of columns per client (worker ID, date, present/absent, OT hours, weekly off, holiday) | Files can be uploaded, not retyped |
| Cut-off and approval rule | Last date for attendance, who approves it at the site, written in the contract | No waiting for late sites |
| Minimum wage tracker | Current notified rates by state and grade, with the date of each change | No old rates after a new notification |
Swipe sideways to see all columns.
The contract labour payroll process in 8 steps
- Fix the cut-off. Agree that every site sends attendance by a set day, for example the 1st or 2nd of the next month, in the agreed format.
- Collect attendance from every site. Take the client’s own Excel or punch report. Do not retype it into a new sheet.
- Check the attendance. Run the checks listed below and send flagged lines back to the site the same morning.
- Get site approval. The site in-charge confirms days and overtime hours by email or signature. Keep this as proof for the client and for inspection.
- Run salary with each client’s rate card. Earned wage for days worked, overtime, holiday pay and allowances, then PF (12% of PF wage) and ESI (0.75% of gross for covered workers) deductions.
- Clear exceptions. New joiners, leavers, full and final settlements, arrears, advances and any worker below the minimum wage after deductions.
- Pay and give payslips. Make the bank file, pay before the due date and give each worker a payslip in a language they can read.
- File and bill from the same numbers. Make the PF ECR and ESI file, pay the challans, and send the client invoice and salary statement built from the approved attendance.
Step 8 matters most for the client. As principal employer, your client can be held liable if PF or ESI is not paid, so it will ask for challans and a worker-wise statement. See PF and ESI for contract workers: who pays for what the client checks.
A one-day payroll plan (example)
This is an example plan for a contractor paying a few hundred workers across several client sites, once the one-time setup is done. Your times will differ.
| Time (example) | Work | Output |
|---|---|---|
| 09:00 | Upload attendance files from all sites | All sites in one place |
| 09:30 | Run attendance checks; send flags back to sites | List of lines to fix |
| 11:30 | Fixes in; site in-charges approve | Approved attendance |
| 12:30 | Run salary, PF and ESI for every client | Draft salary sheet |
| 14:00 | Clear exceptions: joiners, leavers, arrears, advances | Final salary sheet |
| 15:30 | Make payslips and bank file; send for payment approval | Bank file, payslips |
| 16:30 | Make PF ECR, ESI file, salary statement and client invoices | Statutory files and bills |
Swipe sideways to see all columns.
The plan only works if attendance comes in on time and is not retyped. If two sites are always late, put the cut-off in the contract and run those sites in a second batch instead of holding everyone’s salary.
Attendance checks to run before salary
Most payroll disputes start with attendance, not with the PF formula. Check these before you run salary:
- Days present plus weekly offs and leave are not more than the days in the month.
- No worker is marked at two sites, or in two shifts, on the same day.
- Overtime hours are within the state limit and match the shift length.
- No overtime on a day marked absent.
- Every worker on the sheet exists in the worker master, with UAN, ESI number and bank account.
- New names on the sheet have a joining date; missing names have a leaving date.
- Holidays worked and weekly offs worked are marked separately.
The same attendance feeds your wage register for contract labour, so a clean sheet also keeps your registers right.
Monthly due dates (India)
| What | Due by | Note |
|---|---|---|
| Wages for a monthly wage period | Before the end of the 7th day of the next month | Code on Wages, 2019 (section 17). Daily, weekly and fortnightly periods have shorter limits. |
| PF (ECR and challan) | 15th of the next month | Worker and employer share for the wage month |
| ESI contribution | 15th of the next month | For covered workers (wages up to ₹21,000 a month) |
| Client invoice | As per your contract | Built from the same approved attendance |
Swipe sideways to see all columns.
If attendance arrives on the 2nd and salary is due by the 7th, you have about four working days. A one-day payroll gives you room for one round of fixes and for late sites.
Payroll day checklist
- Attendance received from every site in the agreed format.
- All checks run; flagged lines fixed by the site.
- Written site approval saved for each client.
- Current minimum wage used for every grade and state.
- Salary run with each client’s own rate card.
- Joiners, leavers, arrears and advances cleared.
- Bank file checked against the salary total.
- Payslips ready for every worker.
- PF ECR and ESI file made from the same salary sheet.
- Client invoice and salary statement match the approved attendance.
Excel or software for the payroll process?
| Step | Paper / Excel | Typical HR payroll software | DinMind ContractPay |
|---|---|---|---|
| Attendance from many client sites | Copied into one sheet by hand | Built for own staff attendance | Upload each client’s own attendance Excel |
| Checks before salary | Found by eye, often after payment | Some checks, often for own staff only | Auto check flags mistakes before approval |
| Rules per client | One sheet per client, copied monthly | Usually one company policy | Each client’s wage, overtime and PF rules saved once |
| Payslips, bank file, PF ECR, ESI file | Made one by one | Yes, sometimes as add-ons | One click from the same payroll |
| Client invoice | Separate sheet | Usually not covered | Client invoice and salary statement from the same data |
Swipe sideways to see all columns.
ContractPay is DinMind’s payroll software for manpower contractors and labour supply agencies. You see all client companies on one screen, upload the client’s attendance Excel, and the auto check flags mistakes before approval. Salary, PF and ESI are calculated with each client’s rules, and payslips, bank file, PF ECR, ESI file, salary statement and client invoice come from one set of approved data, in English and Tamil. Factories that hire contractors can check contractor PF, ESI and documents with GateCheck contractor compliance. DinMind was founded in 2013, 50+ companies use our software, and most modules go live in 4–8 weeks.
Country notes
India: wages for a monthly wage period must be paid before the end of the 7th day of the next month under the Code on Wages, 2019 (Labour Codes in force from 21 November 2025). PF and ESI are due by the 15th of the next month. Minimum wages differ by state, zone and grade.
Gulf (UAE, Saudi Arabia, Qatar, Oman): salaries are usually paid through each country’s wage protection system, so the bank file and attendance records must match. DinMind builds custom payroll software for Gulf rules.
Singapore and South-East Asia: in Singapore, the Ministry of Manpower requires salary to be paid within 7 days after the end of the salary period, with a longer limit for overtime pay. Other countries in the region set their own pay dates.
USA, UK and Australia: pay dates and payslip rules are set by state or national law. For example, Australia’s Fair Work Ombudsman requires pay slips to be given within one working day of pay day. The same process — one approved attendance record used for pay, filings and billing — works everywhere. DinMind can build custom software for local rules.
General information only, not legal advice. Rules change and differ by state and country — always check with your consultant or a local advisor.